1356013-11-1869" Thirteen years passed [from 8 December 1856] before flooding again affected Yarm. This was a snowmelt flood at an unusually early date 13 November 1869. Heavy snow had fallen on Wednesday 9. The thaw followed quickly from Friday onward accompanied by a strong westerly wind and heavy rain. Effects were most notable in the upper reaches. ... Near Darlington a temporary bridge belonging to the Merrybent railway company at the site of the present A1(M) bridge was carried off"025 - Tees GroupJeremy Benn
1356101-11-1882"On the Callander and Oban Railway which had been completed through to Oban only in 1880 the bridge over the Nant Burn just East of Taynuilt station was washed away in a storm in November 1882. It was replaced by a timber bridge as a temporary measure and this lasted for several years until replaced by a substantial two span bridge of wrought iron girders between masonry abutments and with a central pier of cast iron cylinders which was completed in 1887 "090 - Loch Linnhe GroupJeremy Benn
1356226-12-1886"A bridge washout in December 1886 at Selham on the London Brighton & South Coast Railways branch to Midhurst left the single track suspended over a substantial gap. "041 - Sussex Rivers GroupJeremy Benn
1356321-09-1891"The 21st day of September 1891 will be a day long remembered in the history of Galashiels and its neighbourhood as witnessing the greatest floods recorded in the annals caused by an extraordinary rainfall of many hours previously and resulting in the loss of at least one life. On Sunday rain fell heavily all day and continued all night and Monday morning accompanied by that time by a strong wind from the North West. It is said that such a storm of wind and rain....had not been known in 30 years. Train and telephone communications with the north were cut off the former owing to devastation on the railway between here and Stow.The first intimation received in Galashiels of any danger from a coming flood was almost 4 oclock on Monday morning.Owing to the damage sustained to the iron bridge there (the dyeworks) it was bounded up at both ends. Inspection shows that the both banks of the river have suffered greatly from the amount of earth which has been swept away. "021 - TweedJeremy Benn
1356415-06-1914"The disaster seems to have been as sudden as it was calamitous. There had not been any abnormal rainfall in the CarrBridge district though the weather had been showery there as elsewhere in the North. On Wednesday a sharp thunderstorm was experienced with heavy showers; but the rivers and streams were not of more than normal depth. So it was on Thursday until the afternoon. Shortly after one oclock an up goods train from Inverness passed along the line and over the Baddan Bridge in safety. The next train on the same road was the ten a.m. down from Edinburgh and Glasgow to the North. It crossed the Baddan Burn about 3.20 p.m. and was wrecked. The burn" had become a cataract which filled the deep gorge and hurled huge boulders trees and everything before it.The accumulation of destructive waters was even more sudden than this indicates. It was due to a cloudburst which people living in the district say broke about 2.30 over Carn Glas away to the northwest of CarrBridge. The mountain is over 2000 feet high and lies some miles north of Baddan Bridge. On its slopes the storm broke. The heavy clouds almost blotted out daylight lights being required to enable work to be done indoors. Fierce though the downpour was the area affected was limited and the duration brief not more than one hour if so long but in the time enormous quantities of rain fell. In the distance bright sky could be seen and it was only when one came within a mile or two of the scene of the disaster that the roads showed much sign of rain. Carn Glas was apparently the centre. Part of the flood swept down the western slopes farms and buildings between the mountain and the River Findhorn being damaged and in some instances partially submerged.From the southern slopes the extraordinary deluge rapidly collected and concentrated to work out its fury lower down. One stream has its source high up on Carn Glas and flowing south is joined by another coming from the west. The point of junction is a little distance above the main road and the demolished road bridge which is not more than 6 or 7 feet above the bed of the stream and is approached by embankments on each side. The narrow valley down which the two streams come joins above this bridge the wide valley through which the road runs and between the road and the railway there is a wide flat space along which flowing east and at the bottom of the railway embankment is a third stream. The distance between the road and the railway is between 200 and 300 yards. This flat is bounded on the south by the ridge along the north side of which the railway runs and on the east by another ridge. The latter treads southeast and approaches the other; at the point where the railway crosses the stream the valley narrows considerably. The railway embankment crosses it at a height of about 30 feet. A few hundred yards north of the railway bridge an irregular bar of rock crosses the valley and is only slightly lower than the embankment. Through this the waters pour in a narrow chasm in the solid rock and just before reaching the railway bridge make a sharp turn to the south. Where the rocky obstruction barred the water the flood rose almost to the top of the embankment. Indeed a portion of it was eaten away and at one point a depression was caused in the embankment which had to be brought to the normal level by the use of sleepers.The railway bridge itself was in effect the throat of the gorge and received the full force of the water first penned up by the road bridge and afterwards by the cleft in the rocks. Below the scene of the disaster the valley ... TRUNCATED COPY ... waters and boulders. The surface of the flood was almost as high as the bridge the bases of which were practically cut away. When the heavy passenger train steamed on to the bridge train and bridge went down into the raging flood."""008 - SpeyJeremy Benn
1356504-09-1931"On September 4th, 1931, there occurred an almost precisely similar flood to that of July 20th to 23rd, 1930. ... There were some remarkable features about this flood. It began to rain about 17h on September 3rd and by 13h 30m on September 4th the river had risen at Grosmont Priory [a few km downstream of Egton Bridge] to 21 feet above its level on the day before. The real point is that this 20 hours of rain produced a rise of the river only 9 inches lower than that due to nearly 4 days rain in 1930. [pp 65-66]"027 - Ouse (Yorkshire)Jeremy Benn
135661901George Hewins (18781977) tales of life in StratfordUponAvon includes a description of a great flood in 1901 at the beginning of Chapter Ten (page 78). This was almost certainly the notable flood that some accounts suggest peaked on 31 December 1900 (for example the StratforduponAvon Herald of 4 January 1901 reported that the flood reached its peak before midnight on 31 December 1900) but is recorded elsewhere as occurring on 1 January 1901 (there is a plaque on the wall of No. 18 Waterside StratfordUponAvon which shows the 1 January 1901 flood to have been higher than floods that occurred on 23 May 1932 and Easter 1998).His story begins: The river was still flowing under the ice; it kept washing it you sensed it was there and then one day when you werent thinking on it the river began to show. We got clay from the brickyard and plastered the doors up. That didnt stop it. We got the furniture upstairs when we saw the water coming over the Bancroft Gardens and over the coal wharf. On and on it came up the drain through the cellars. At Waterside at Cals it was three foot six in her bottom rooms"An accompanying picture shows Waterside inundated by flood water with the caption:" Waterside in the floods 1901. Cal Cooks door can be seen beyond the tall building in the centre (the Wheatsheaf public house). [The picture shows the building to be on the theatre side of Waterside (i.e. nearest the river) with flood water reaching the cottages opposite (now the site of a flood plaque)].In conversation with Cal still in her property George tells her "Clopton Bridge is still blocked � you cant tell where the river is � I seen a cow goin down this morning."" Cal ... she was crafty: when wed had a lot o rain and the snow began to melt she knowed what was coming. Shed got stuff in moved her furniture upstairs.""The floods reached Pimms Court but not to get in the house just the tail end o the wave. Oh the smell when it went away! The Corporation brought disinfectant and they got the Fire Brigade to pump water out o folks cottages. The stink! But the thaw meant I could start looking for work again." [Warkwickshire Avon]"054 - SevernAdrian Bayliss
1356704-08-1826Severe thunderstorm lasting from 3pm to 7pm. The East Dart was most swollen. The clapper stones of the old bridge at Dartmeet were washed off. The river made a clear passage along the hollow on the east side of the new bridge, so any passing there was interrupted. General flooding occurred on this day at many places around Dartmoor, in particular Okehampton and Moreton. SUMMARY FROM EXETER FLYING POST046 - Dart GroupPeter Bailey
1356819-06-1844Ashburton: Clouds appeared at about 11am, then heavy rain "like a waterspout" at noon. Rain lasted about an hour. Weather had previously been hot and sunny. After just a few minutes, the "long-dry water courses" could not carry the stream. The lower part of the town by the shambles was flooded.046 - Dart GroupPeter Bailey
1356928-08-1848The River Dart rose higher on Monday night (28th August) than ever known during summer months. A flood came down from the Dartmoor hills with unusual rapidity. Water rose above 12 feet on the banks within a few minutes. SUMMARY FROM EXETER FLYING POST046 - Dart GroupPeter Bailey