View Details

Event Details
ID9770
Year1889
Month03 (March)
Day
CalendarNew
Quotation1889 March "A fall of 1.13in.of snow and rain in 2 days in March, following a fall of 1.40in. in February, caused the water in the Witham at Bardney, to rise to 18ft. 5in, on the gauge, or within 3 in. of the highest known flood; at the Grand Sluice it only rose to 10ft 6 in, falling to 7ft. 6in. at low water. At the Black Sluice the height was 15ft. 2in. and 11ft. 3in. This freshet was partly due to the ground being frozen when the rain fell. The bank broke on the east side of Branston Island, and the water flooded about 700 acres, The washes on the Welland were flooded. In May, there was a good freshet in the Witham, following on a rainfall of 1.32in. in 3 days. The water rose to 9ft. 9in. at tide time, falling to 5ft. 6in. at low water" [ha 030, 031]
SourceWheeler, W.H.(1896) A History of the Fens of South Lincolnshire . Second Edition. Newcome, Boston Appendix V FLOODS...... River Witham, and the Black Sluice pumped outfall of South Forty Foot drain to the Witham Estuary] Page 6 ff. : PARTICULARS OF T
Area031 - Welland
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time17/12/1999 11:59:00

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password