View Details
| Event Details | |
|---|---|
| ID | 9764 |
| Year | 1885 |
| Month | 10 (October) |
| Day | |
| Calendar | New |
| Quotation | 1885 October "This flood was due to 4.75 in. of rain falling in 26 days, of which 2in. fell in 4 days. The rainfall of the previous month had also been above the average. Owing to the improved condition of the Outfall of the Witham, by the opening of the New Cut through the Clays, this flood passed rapidly away without causing any inundation. In the Welland the river was full, nearly to the top of the banks, and all the wash lands were flooded." [ha 030] |
| Source | Wheeler, W.H.(1896) A History of the Fens of South Lincolnshire . Second Edition. Newcome, Boston Appendix V FLOODS...... River Witham, and the Black Sluice pumped outfall of South Forty Foot drain to the Witham Estuary] Page 6 ff. : PARTICULARS OF T |
| Area | 030 - Witham and Steeping |
| Contributor | Frank Law |
| Reference | |
| Related URL | |
| Geo Reference | |
| Entry Date/Time | 17/12/1999 11:56:53 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253