View Details
| Event Details | |
|---|---|
| ID | 9758 |
| Year | 1882 |
| Month | 10 (October) |
| Day | |
| Calendar | New |
| Quotation | 1882 October "This flood was due to heavy rains in September and October. The total for the two months being 8.12in. There were heavy floods in the Witham and a large area of land about Lincoln was under water. Barlings Eau Bank gave way. The water at Bardney rose to 18.6ft. on the gauge. One opening of the Grand Sluice was closed owing to the works for the enlargement of the sluice. The average height of the water inside the Black Sluice at tide time was 14ft. 11in. for seven days, falling to 11 ft. 5in. at low water, giving a depression of 3ft. 6in. The water in the Glen rose to 11ft. on the gauge at Tongue End. A breach occurred in the bank on the south side, near Wooley's Mill, and the washes were inundated. This caused a large quantity of water from the Glen to flow down through the Deeping Fen Main Drain to the Welland. [ha 030, 031] |
| Source | Wheeler, W.H.(1896) A History of the Fens of South Lincolnshire . Second Edition. Newcome, Boston Appendix V FLOODS...... River Witham, and the Black Sluice pumped outfall of South Forty Foot drain to the Witham Estuary] Page 6 ff. : PARTICULARS OF T |
| Area | 031 - Welland |
| Contributor | Frank Law |
| Reference | |
| Related URL | |
| Geo Reference | |
| Entry Date/Time | 17/12/1999 11:50:26 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253