View Details

Event Details
ID9748
Year1877
Month01 (January)
Day
CalendarNew
Quotation1877 January "During the flood at the end of December and beginning of January the spring tides were very high, and the height of the water at the Grand Sluice exceeded that of 1875 by 5in., this being the greatest flood height ever recorded at the Grand Sluice or the Black Sluice, up to this time [1896]. The average height of the water for 11 days at the Black Sluice was 15ft. 3in., falling at low water to 12 ft. The water rose higher at Lincoln than on any previous occasion since 1828. It was 14 in. higher at Bargate Weir than in 1852. The water overflowed the banks of the Witham, the Fossdyke and the Sincil Dyke. All the lower part of Lincoln was inundated. At Bardney the water rose to 18ft. 9in. on the gauge. The river bank, between Five Mile House and Bardney, broke, also the Branston Bank. The north bank of Billinghay Skearth gave way and caused the submersion of from 2,000 to 3,000 acres of land to the depth in some places of 5ft., the inhabitants being driven out of their houses. At the Black Sluice the water rose 2in. higher than ever before recorded, and at Donington Bridge, 3in. higher. The water ran over the Overfall at Tongue End for more than a fortnight. In the Welland the water rose so high as to cause serious fears for the Barrier Bank and the Deeping High Bank. The washes were covered with water for a length of 16 miles, and in places 1 mile in width, the depth on the level being 7ft. Deeping St. James was inundated and the streets covered with water, making the fifteenth time in 17 months. In the Glen the water rose 14in. higher than ever known before, the height on the gauge at Tongue End being 11ft. 11in. It ran over the top of the banks on both sides, and breaches were caused in three places, one near Pinchbeck, the water flowing nearly up to the Church ; the others on the north side between Tongue End and the Railway Bridge over the Counter Drain. The whole of Bourne North Fen and Dyke Fen were inundated, the water extending, more or less, to the fens of Haconby and Morton. The traffic on the Bourne and Spalding Railway was stopped for a considerable time. On the south side of the Glen the Counter Drain Wash Lands were inundated, and the water rose to the top of the bank, which was split and opened in several places. This flood was caused by very heavy rains in December, the quantity which fell during that month being 4ΒΌ in., 3in. falling on the last 14 days of the month, or at the mean rate of 0.22 per day. The rainfall in September had been very heavy, the excess from August having been nearly 5in." [also ha 031]
SourceWheeler, W.H.(1896) A History of the Fens of South Lincolnshire . Second Edition. Newcome, Boston Appendix V FLOODS...... River Witham, and the Black Sluice pumped outfall of South Forty Foot drain to the Witham Estuary] Page 6 ff. : PARTICULARS OF T
Area031 - Welland
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time17/12/1999 11:45:06

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password