View Details
| Event Details | |
|---|---|
| ID | 9746 |
| Year | 1875 |
| Month | 11 (November) |
| Day | |
| Calendar | New |
| Quotation | 1875 November "The flood in November was the highest known in the Witham up to this time. The rainfall for the month was 4.90in., that for the previous month having been 3.25in. The water rose in the Witham to 13ft. 4in. on the gauge at Bardney. The bank of Digby Drain broke and flooded 1,000 acres of land in Digby and Walcot Fens, the water covering the land in places to a depth of 6ft. The Bane and its tributaries overflowed their banks. All the low part of Holland Fen was under water. At Hobhole sluice the water rose during tide time to 12ft. 5in., falling at low water to 9ft. The pumps at Lade Bank had to cease working, as the water rose above the top of the doors. The water was only kept from overflowing the banks of the Glen at Surfleet by ernploying a number of men to raise cradges. The water rose to 11ft. on the gauge at Tongue End. Cowbit Wash was covered 6ft. deep, and the streets of Deeping St. James; and Market Deeping rendered impassable. The Welland rose up to the centre of the London Road at Spalding." [also ha 031] |
| Source | Wheeler, W.H. A History of the Fens of South Lincolnshire . Second Edition. Newcome, Boston Appendix V FLOODS...... River Witham, and the Black Sluice pumped outfall of South Forty Foot drain to the Witham Estuary] Page 6 ff. : PARTICULARS OF THE FLOO |
| Area | 031 - Welland |
| Contributor | Frank Law |
| Reference | |
| Related URL | |
| Geo Reference | |
| Entry Date/Time | 17/12/1999 11:42:12 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253