Quotation1892 January 29 p104: "There was in course of construction over the River Carron, in Ross-shire ... a new steel girder bridge of 50 feet span ... the two lattice girders forming the sides of the bridge were in position, and the contractor was about to put on the flooring, which was of corrugated steel plates, and which was to have connected the two girders, when the flood came on. The river at the point spanned by the bridge runs in a narrow and rocky gorge, the bed of the river being no less than 40 feet below the level of the bridge, or 45 feet from the top of the girders. The normal depth of water at this point is 13 feet. There was thus a clear space of 27 feet between the bottom of the bridge and normal water level ... Not only did the water reach the level of the bridge but it actually flowed over the tops of the girders ... one of the girders - a mass of steel weighing over four tons-was swept from its supporting abutments and carried to a distance of eighty yards down the river before it stranded. ... Four railway rails, each 26 feet long and weighing 5 cwt., were also carried away; two of them which were bolted together (weight 10 cwt.) were carried 97 yards down the river, a third 220 yards, and a fourth was swept over the falls near the junction of the rivers Calvie and Carran, over 400 yards from the site of the bridge. The Glencalvie Bridge is 12 miles above the ill-fated Bonar Bridge, in the same water ... It might be mentioned that up till 5 p.m., when the workmen left their work at Glencalvie Bridge on 28th January, the water was very low, and covered with ice, so that the deer were crossing a little below the bridge on the ice. When the men returned to their work at 6 A.M. the following morning the bridge was away, and the river was rushing over the tops of the piers and the fallen girder which remained on them. The flood was sudden, unexpected and overwhelming ... The engineers and contractors for this bridge were Messrs Smith, Ness Iron Works, Inverness, a local firm ... When the flood subsided the work of fishing out and reinstating the fallen girders was expeditiously carried out by the contractors, and the bridge is now completed, a handsome structure and a great convenience to the district". [ha 003]
SourceNairne, D. ( 1895) Memorable Floods in the Highlands during the Nineteenth Century..... Part Fifth. Northern Counties Printing, Inverness.
Area003 - Shin Group
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time13/12/1999 16:49:09

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password