View Details

Event Details
ID9162
Year1894
Month11 (November)
Day
CalendarNew
Quotation"WALLINGFORD - THE FLOODS - The heavy and continuous rains have again increased the flooded state of the Thames in this district. The water during Monday night [12th November 1894] rose 16 inches.- The river continued to rise on Thursday, the flood being the highest within living memory, and the scene from the bridge has been witnessed daily by hundreds of spectators. At the Crowmarsh end the water flows in a stream down the village street, the pathway being three inches deep in water. At the town end the water covers the road from the "Town Arms" to the Oxford Canal Wharf, the wharf premises being a sheet of water, and a punt having to be used, the stream coming in at the front door. At Mr Cornesby's landing stage at the lower wharf, the water has entered the house, and several of the houses in St Leonards-lane adjoining are flooded. In Winterbrook the water is in the road up to the axle-trees of vehicles, and one or two boat houses in this direction have been washed away. The water mark on Thursday [15th November] at mid-day was four inches higher than the great flood of 1875."
SourceReading Mercury, Saturday, November 17, 1894, p. 4.
Area039 - Thames
ContributorJohn Miller
Reference
Related URL
Geo Reference
Entry Date/Time19/10/1999 18:53:17

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password