| ID | 8767 |
| Year | 1909 |
| Month | 02 (February) |
| Day | 02 (Tuesday) |
| Calendar | New |
| Quotation | 1909 February 2 Loch Leven Water-power Works: "On the following day [after closure 'during a dry spell of weather with the river very low' of the diversion tunnel], the 2nd February, 1909, occurred the heaviest fall of rain experienced during the whole 4 years of construction. The rainfall for the 24 hours ending 9 a.m. on 3rd February amounted to 5.59 inches at Kinlochleven and 3.92 inches at the dam, with the result that the water-level of the [Blackwater] reservoir rose 36 feet in about 30 hours...". Fig 1 states "Catchment area 55 sq miles" to the dam, maximum height about 86 feet, which impounds "more than 20,000 million gallons of water".[R. Leven] |
| Source | Roberts, A.H. ( 1911/12) The Loch Leven Water-power Works Min. Proc. I.C.E. vol CLXXXVII p 28-73 |
| Area | 090 - Loch Linnhe Group |
| Contributor | Frank Law |
| Reference | |
| Related URL | |
| Geo Reference | |
| Entry Date/Time | 13/09/1999 12:25:11 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253