View Details

Event Details
ID7361
Year1910
Month12 (December)
Day
CalendarNew
Quotation1910 December "The December 1910 flood was caused by continuous rain following a fall of snow. At Newark the Kelham Flood Road was 2 ft under water for a time and once again the floods extended over the washland area between there and Gainsborough, only trees and fences being visible. At Collingham the flood waters spread on to Low Street, alongside the church on the 4th, and at the peak came within 18 ins of the 1875 level there. Parts of Gainsborough were flooded, as was the flood road across the marshes to Beckingham, and the trans-valley railway ceased operation for a time. Banks at Laneham were overtopped, as were those at Littleborough. The river banks were breached opposite Lea Marshes. In the Idle valley the Retford area was badly flooded and lower down at Hayton and Mission the water formed one vast lake." [Trent and Idle]
SourceNixon, M. Engineer to Trent River Board (1960) Report on the Tidal Reach Improvement Scheme. p 67-69 App IV HISTORY OF FLOODING IN THE TRENT VALLEY UP TO 1930
Area028 - Trent
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time16/12/1998 17:02:26

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password