View Details

Event Details
ID6470
Year1912
Month08 (August)
Day27 (Tuesday)
CalendarNew
Quotation1912 August 27 "The high level of the water on the Whittlesey Wash, affected the river level at Peterborough where a maximum level of 16.4 above Newlyn datum (nearly 7 ft. above normal) was attained [in March 1947]. This is comparable with the August 1912 level." "On August 27th 1912 the level at Stanground Sluice was 15.9. This was the highest level in a record dating from 1905 [cf 15.8 there in March 1947]."
SourceClark, H. (1947) Report on the Floods of March 1947. River Nene Catchment Board. P6/7
Area032 - Nene
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time23/10/1998 16:47:57

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password