| Event Details | |
|---|---|
| ID | 6153 |
| Year | 1891 |
| Month | 08 (August) |
| Day | 13 (Thursday) |
| Calendar | New |
| Quotation | "August 13/14 "the very heavy and continuous rains of the past week have done serious damage in East Lancashire, especially in the district extending from Blackburn to the Darwen Valley and away to Heapey. Low lands near Preston were covered with water, and the Ribble and its tributaries overflowed their banks. At Blackburn the Irwell overflowed, and several mills stopped work........ In the Darwen Valley there was enormous damage. During Thursday night (13th) very heavy rain fell in Darwen, and very great destruction of property occurred. The river Darwen rose 10 ft, and all the fields on its banks were flooded. During the forenoon the water subsided to about 3 ft or 4 ft. The upper and lower ends of the town suffered most, although in dozens of houses at the foot of the Darwen moors the cellars were flooded. At the upper end of the town between Grimshaw Street and Pilkington Street where the culvert takes a bend, the volume of water was so great as to burst the culvert near a row of houses in Pilkington Street, and at 9 o'clock the walls of some of the houses fell down with a crash, and were rapidly swept away by the stream. At the bottom of Longford Road the water from the Moors came down with considerable force and brought down to Bolton Road loads of dirt and sand, which had to be carted away. The Darwen Company's mill is in the same district, and at 6 o'clock yesterday morning (14th), it was found impossible to work the pumps, in consequence of the quantity of dirt which had been swept into the reservoir. The workpeople to the number of 450 had to remain at home until dinner time, when another effort was made to start the pumps. The Spring Vale end of the Sough tunnel was flooded for over three hours yesterday morning, and traffic had to be conducted on a single line. The culvert at the side of the tunnel was too small for the water, and at 5.30 the up line to Manchester from Darwen was flooded. In the hilly district of Heapey the rainstorm raged with fury, and houses and mills suffered seriously. Yesterday morning (14th) at 3 o'clock it was found that the embankment about half a mile beyond Heapey station was giving way, and the engine drivers were warned. A couple of hours later the swollen brook, which runs besides the highway from Heapey to Chorley, overflowed its banks and forced its way under the railway bridge; this caused the wall to give way and part of the bridge and tons of earth were flung across the rails. The water then rushed across the line and a large volume flowed down the line, and undermined the foundations so seriously that traffic had to be stopped. The first to discover the mishap to the bridge was an engine driver, a couple of waggons being thrown off the track. It was some hours before the traffic could be resumed. A third slip occurred at the bridge, close to Heapey station, but this was not serious. [R. Darwen/ R. Ribble] |
| Source | British Rainfall 1891 p24 |
| Area | 071 - Ribble |
| Contributor | Frank Law |
| Reference | |
| Related URL | |
| Geo Reference | |
| Entry Date/Time | 16/10/1998 10:30:20 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253