View Details

Event Details
ID14618
Year2005
Month01 (January)
Day07 (Friday)
CalendarNew
QuotationInverness: "Flooding of the River Ness occurred again in January 2005, when the river overtopped the banks andexisting flood defences. High flows in the river, of approximately 610m3/s, occurred on the evening of 7th of January. This highflow equates to around a 1 in 25 year return period (a 4% annual probability of occurrence). The river overtopped the bank level at Ladies' Walk, and inundated the footway. Further upstream, Ness Islandsand Whin Island were also partially inundated. The flow in the river was greater than 480m³/s for 5 days, between the 7th and the 13th of January."
SourceMott Macdonald (2005) River Ness Flooding - Inverness : Pre Feasibility Report on Flood Protection to The Highland Council
Area006 - Ness
ContributorFrank Law
Reference
Related URLhttp://www.highland.gov.uk/NR/rdonlyres/7F463C0B-482C-4C87-9FC2-4F506CEBBEE3/0/invernessfloodingreport.pdf
Geo Reference
Entry Date/Time29/06/2010 16:43:50

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password