View Details
| Event Details | |
|---|---|
| ID | 14616 |
| Year | 1989 |
| Month | 02 (February) |
| Day | |
| Calendar | New |
| Quotation | Inverness: "There have been two severe floods in the last 15 years [prior to 2005]on the River Ness, in February 1989 andFebruary 1990. Both of these events occurred because an abnormally high flow in the river coincided with a high tide; and both were preceded by weeks of heavy rainfall in the region, resulting insaturated ground and high storage volumes in the major lochs of the basin. The peak discharge at the Ness-side gauging station during the 1989 flood was about 800m3/s and around 650m3/s during the smaller 1990 event. In 1989 a stretch of over two kilometres on the right banki was flooded, with extensive damage to property and roads. Two weeks after this flood, the railway bridge across the river collapsed; it is thought to have been damaged by the floods and then undermined by scour due to the continuing high river flows. In 1990 out-of-bank flooding occurred again throughout Inverness, with damage toproperty." |
| Source | Mott Macdonald (2005) River Ness Flooding - Inverness : Pre Feasibility Report on Flood Protection to The Highland Council |
| Area | 006 - Ness |
| Contributor | Frank Law |
| Reference | |
| Related URL | http://www.highland.gov.uk/NR/rdonlyres/7F463C0B-482C-4C87-9FC2-4F506CEBBEE3/0/invernessfloodingreport.pdf |
| Geo Reference | |
| Entry Date/Time | 29/06/2010 16:42:12 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253