View Details

Event Details
ID14537
Year1949
Month01 (January)
Day07 (Friday)
CalendarNew
Quotation"Heavy rains during the month of January [1949] caused the River Tweed to breach the cauld or weir at Walkerburn between Peebles and Galashiels. The railway was inundated and on January 7 when the flood was at its height Walkerburn Station was flooded to the depth of 2 ft. 6 in. About � mile east of the station one of the abutments of the bridge carrying the railway over the Bold Born was scoured to a depth of 8 ft. "
SourceThe Railway Magazine 1949 Vol. 95 No. 582 July & August 1949 271.
Area021 - Tweed
ContributorHenry Gunston
Reference
Related URL
Geo Reference55.622765, -3.029856

Entry Date/Time31/01/2010 12:46:37

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password