View Details
| Event Details | |
|---|---|
| ID | 13516 |
| Year | 2005 |
| Month | 06 (June) |
| Day | 28 (Tuesday) |
| Calendar | New |
| Quotation | "....The highest 24-hour total was on the 28-29th at Runley Wood when 38.8 mm of rainfall was recorded, in fact most of the rain fell in a two hour period......between 10-11 p.m. 9 properties suffered internal flooding. Initial investigations suggest a depth of water over 6 inches entered properties through front rear points of entry. The properties affected were in The Hedgerows, Luton alongside the Houghton Brook, a main river tributary of the Rver Lee. The property is shown as at risk on our Flood Map but there is no significant history of flooding, however, the foundations of these properties were reported as flooded during construction in 1995 by our River Inspector...[cause] related to an adjacent footbridge with low soffit level, combined with trash/debris which dammed the river resulting in water levels backing up..." |
| Source | Environment Agency Thames Region (2005) "Flooding in the Thames Region 28/29th June 2005 " Report No. T/RFDC/05/43B |
| Area | 038 - Lee |
| Contributor | Frank Law |
| Reference | |
| Related URL | |
| Geo Reference | |
| Entry Date/Time | 22/07/2005 09:22:54 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253