View Details

Event Details
ID12682
Year1886
Month05 (May)
Day
CalendarOld
Quotation"...The flood of 1886 rose higher at Diglis than the flood of 1852, and continued higher down to Saxons-lode-bridge, because a railway embankment in connection with that bridge had been constructed across Upton Ham, between those two periods... "
SourceHenry J. Marten, Engineer to the Severn Commissioners (1886) Symon's Meteorological Magazine Vol CCXLV, p103-105
Area054 - Severn
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time09/11/2002 21:48:43

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password