View Details
| Event Details | |
|---|---|
| ID | 12533 |
| Year | 1929 |
| Month | 12 (December) |
| Day | |
| Calendar | New |
| Quotation | Caption to 2 whole page air photographs of floodplain properties inundatedin the Weybridge area "On December 9 the Thames was still rising, and it wasanticipated that the rise would continue even if the rain ceased. Lord Desborough explained at a meeting of the Thames Conservancy Board '..at the fourteen recording stations of the Board in the Thames Valley the average rainfall for October was 3.7 in., and for November 7.5 in. In the first eight days of December it was 2.44 in.....The Thames could take a flow of 4,500,000,000 gallons in 24 hours. ...The flow at Teddington in the preceding 24 hours [to Dec.9] was 7,500,000,000 gallons. That was not very exceptional, and the water had got away well. In 1915 the highest flow was 11,000,000,000 gallons.' " {R.Wey] |
| Source | Illustrated London News for Dec. 14, 1929, pages 1055/6 |
| Area | 039 - Thames |
| Contributor | Frank Law |
| Reference | |
| Related URL | |
| Geo Reference | |
| Entry Date/Time | 04/10/2002 10:22:15 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253