View Details

Event Details
ID12522
Year1890
Month
Day
CalendarNew
Quotation"The Bristol (River Frome) Act was obtained in 1887, by which powers were granted to construct certain works, of which the following were carried out: a relief culvert 156 yards in length 12 feet wide and 7 feet 6 inches high, from the river Frome at a point about 1200 yards above its mouth, to the floating harbour; the waterway was widened and deepened at various points....an ancient archway was reconstructed; new sluices were provided in the floating harbour...These works were completed in 1890 at a cost of £42,779....The Bristol Floods Prevention Act, 1890, was obtained to improve the channel of the Frome, to construct the Black Rock culvert, and to make improvements in the Malago brook. "
SourceW.J.Steele, Deputy City Engineer (1901/02) " Floods Prevention Works in Bristol" Proc. Inc. Association of Municipal and County Engineers
Area053 - Avon (Bristol)
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time03/08/2002 17:39:40

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password