View Details

Event Details
ID11326
Year1923
Month
Day
CalendarNew
Quotation1923 Middle Level: "... in drought periods the sluices at St. Germans silted up on the tidal side. In 1923 the mud and silt accumulated to a depth of 13 feet above sill level, corresponding to 3 feet above water-level on the fen side of the outfall-sluice." [ha 033, left bank tributary of tidal Bedford Ouse]
SourceClark, R.G. ( 1936) "St. Germans Sluice and Pumping Station" Journal, Institution of Civil Engineers No. 6 p380
Area033 - Great Ouse
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time03/08/2000 10:59:58

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password