Quotation1886 May 15 WORCESTER: " The waters of the Severn and Teme continued to rise until 1 am on Saturday, when they reached a point higher than any flood since 1770 and 2 inches higher than the flood of 1795, so that the inundation was greater than any similar visitation for 116 years. No one now living remembers anything like such a deluge as that which occurred at Worcester, either for the unexpectedness with which it came about or the height to which the water rose. There is no record of such a flood in summer, all previous great floods having been in the winter. That of 1770, which was only 2½ inches higher than the present one, occurred in November. That of 1795 was in February, when the river below the bridge was blocked with ice; and there is a tradition that this held back the water above the bridge and made the flood some 12 inches higher above than it was below the bridge. The great flood of 1852 happened in November, and was 5 inches below the point now recorded. About midday on Friday 14th, the railway bridge over the Teme between Bransford and Henwick gave way in consequence of the flooding of the river. The centre pier collapsed, and although the railway metals remained they sank down with the structure, and the line became impassable.The present flood will be remembered not only for its severity but for its prolonged duration. The hope which many people cherished that the waters, when they once had reached their height, would subside almost as rapidly as they had risen, was disappointed. The subsidence indeed from the first was remarkably slow, and during the whole of Saturday could be reckoned only by inches. Fortunately by Saturday evening something like adequate efforts were made to cope with the distress of those who were suffering most keenly from the effects of the prolonged inundation. At the Corporation Waterworks great consternation was created on Friday afternoon by the flood waters getting into the grounds, and then rapidly rushing into the boiler houses. Some steam fire engines were procured, and were kept constantly at work to prevent the flood reaching the boilers. The water, however, reached the fires and put them out, so that the engines could not pump to the reservoir for the supply of the city..... On Saturday the grounds and works were completely flooded, the whole of the filtering and other tanks being under water. The result was that, instead of there being a constant supply of water tot he city, there was only a little to be obtained for half an hour in the morning and half an hour in the afternoon. On Saturday night, the floods having receded to the extent of a foot, the boilers became accessible, and the pumping engines were at work all night."
SourceMarriott, W. and Gaster , F. (1886) "The Floods of May 1886" Quarterly Journal of the Royal Meteorological Society Vol XII, p 277
Area054 - Severn
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time22/06/2000 16:04:01

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password