View Details
| Event Details | |
|---|---|
| ID | 10323 |
| Year | 1914 |
| Month | 06 (June) |
| Day | 18 (Thursday) |
| Calendar | New |
| Quotation | 1914 June 18 "Mr A Newlands, Engineer-in-Chief, Highland Railway, read a paper on the extraordinary cloud-burst, and the consequent phenomenal flooding which caused the serious railway accident in the neighbourhood of Carr-Bridge on the 18th June 1914. The following is a summary: 'I arrived at the scene of the disaster about 12.30 midnight. By that time the burn had fallen to less than its ordinary flow height, but evidences of a flood of quite unprecedented dimensions were abundant. I have since carefully examined the evidence of flooding in the drainage area of the burn, extending to six square miles. The two principal burns within the area are the Bogbain Burn, flowing in a southerly direction, and draining 2¾ miles, and the Ruidh Magaig Burn, draining 3¼ square miles. On the Bogbain Burn the evidence of flooding was of quite a normal character, the whole of the flood water having passed through the low arch of the Bogbain Public Road Bridge, 500 yards from the Baddingorm Road Bridge, and alongside the Railway Bridge over the public road, without doing any damage to it and without flowing over the roadway ... The total area of the waterway of this bridge is 56 square feet. The evidences of flooding in the Ruidh Magaig Burn, on the other hand, were of quite an abnormal and unprecedented character. The road bridge had been completely destroyed, and enormous masses of the gorge forming the channel of this burn had been torn out for a height in places of 20 feet. These land slides brought down a number of heavy branching trees ... An eye-witness ... said that the volume of flood water completely dammed the bridge, forming a great lake behind it, which eventually flowed over the roadway and the parapets of the bridge, and finally swept it away. This bridge, which had a waterway of probably 50 square feet, carried the old military road constructed by General Wade's successors, over the burn, and was in existence in 1803, when the Highland Road and Bridge Commissioners took over the maintenance of these roads. The historic flood of 1829, which did so much damage in the North of Scotland, and which had no parallel since 1763, somewhat damaged this bridge, but did not carry it away.The Railway bridge, situated 1000 yards down stream from the road bridge, was a semi-circular arch bridge, built on a skew of 65 degrees, the span being 15 feet on the square and 16 ft 6 in on the skew. The foundations were on the hard gravel or mountain clay of the district, and the bed of the stream was laid with heavy squared granite pitching, extending from end to end of the wing-walls, and protected at each end by a timber wall and piles, made of old railway rails, driven into the bed of the burn. The total length of the arched portion of the bridge was 36 feet. The configuration of this restricted drainage area is that of a shallow depression, with a steep lip or edge at the extreme end, where the burns have their source. I have carefully examined this drainage area, and have followed the two burns referred to almost to their source near the watershed. Evidences of the unparalleled character of the flood of 18th June are abundant all along the beds of the burns in the havoc wrought all along their banks, great masses of which have bene torn out into vertical faces. Here and there large accumulations of boulders have been laid down, and in places accumulations of gravel have been deposited on the top of the banks altogether. In other parts the burn, instead of running over a rough boulder bed, as one would expect, is flowing over stretches of fine, soft, newly-deposited sand, in which one will sink to the knees. It is in the last reaches of the burn, however, that is, in following up the lip or steep part towards the water shed, that the havoc it has wrought is best seen. Here the scene, especially in the upper end of Allt a Bhainne Burn beggars description. The burn has literally torn out and excavated for itself a new bed, about 15 feet deeper than its old one. Rock boulders, many of them weighing 3 and 4 tons, are tumbled together in bewildering confusion, all being enclosed by the precipitous sides of the newly-excavated trench, which is not less than 20 feet in width at its narrowest parts.Keeping in view that on the date of my inspection there was absolutely no trace whatever of any water in several stretches of the burn, it seemed incredible that such havoc could have been possible by such an insignificant streamlet ... there was often a considerable difference in the level of the flood marks at each side of the burn at any point. Where the oncoming mass of water struck a sharp bend in the channel it simply rushed onwards over the top of the obstruction, instead of following round the curve of the burn. To put it simply, this was no volume of running water flowing along a water course; it was an avalanche of water and boulders ... As indicating the enormous force which destroyed the Railway Bridge, it may be stated that solid masses of the arching of it - one of the pieces weighing 8 tons - have been carried over 200 yards down stream, while pieces of the arch of the road bridge, which was destroyed 1000 yards up stream from the railway, were found at the railway bridge. Several of the bodies of the unfortunate passengers who were drowned were recovered from the Dulnan River three and four miles below the scene of the accident. The Railway Bridge, in common with everything else in the path of the onrushing avalanche, was wiped out just as was the road bridge, which had stood for probably 120 years. At the Railway Bridge, the wall of water in roaring through the archway, would form a sort of cascade when it got free vent on the haugh on the down stream side. This cascade tore a great hole in the bed of the stream, which hole was gradually extended backwards towards the bridge until it was undermined, and collapsed. ... The forenoon of the 18th June was sultry and close, with indications to thunder, and about 2 o'clock a dense black cloud overhung the eastmost corner of the Baddengorm Burn drainage area near Cairnglass. A vivid thunderstorm broke out, and a shower of icicles or hail-stones fell. At this time the darkness became extraordinary intense, and the aspect of the day generally is described by some of the local residents as awesome or terrifying ..." [ha008, Ruidh Magaig Burn] |
| Source | Newlands, A. (1915) "The Carr-Bridge Cloudburst" Transactions, Inverness Scientific Society and Field Club Vol 8, p 228-231 |
| Area | 008 - Spey |
| Contributor | Frank Law |
| Reference | |
| Related URL | |
| Geo Reference | |
| Entry Date/Time | 07/06/2000 14:43:20 |
Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252
Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253