View Details

Event Details
ID10245
Year1855
Month
Day
CalendarNew
Quotation1855 summer Beardmore, Engineer to the Lee Navigation, stated in January 1856 "... that the bad state of water in the [upper estuary of the] Thames, during the past year, had been, to some extent, caused by the extraordinary drought of the two preceding years ..." Clutterbuck noted that "In May last [1855], the river was in a most filthy condition, which was ... in his opinion, ... rather due to a defalcation in the 'perennial flow' ... inasmuch as in the eighteen months ending April 1855, only 23.5 inches of rain had fallen, that being the average for twelve months. The perennial flow, especially in the upper districts, before the river received the larger streams flowing from the chalk, was never, in the memory of man, so much reduced. The Surveyor of the Thames Navigation had informed him, that they were enabled to open all the flood-gates of the Pangbourn lock, at one time; a fact without example in his remembrance ... The Cherwell ... was ...(May 1855) so reduced in volume , that it was deemed necessary to contrive a dam to flush the bed of the stream. He had never , from his own observations, known the stock of water in the chalk stratum to have been so low, nor the perennial flow of the streams issuing from it, to have been so reduced..."
SourceBeardmore, N. and Rev Mr Clutterbuck ( January, 1856) Discussion contributions on Henry Robinson's paper " On the past and present condition of the River Thames". Min. Proc. Inst. Civil Engineers Vol 15 , 1855/56, p 226/8
Area039 - Thames
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time16/05/2000 13:56:34

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password