View Details

Event Details
ID10053
Year1919
Month01 (January)
Day
CalendarNew
Quotation1919 January "It would be an apparently reasonable assumption that the natural conditions causing the existence of the Havant and Bedhampton springs had long become stabilised, but in January, 1919, an unexpected phenomenon occurred at the Bedhampton Works, namely, the birth of a new spring. The site was on open ground near ... St. Chad's spring ... The water broke through the surface of the clay sub-soil, forming at first a small fountain about five inches high and two or three inches across. The sides then gradually caved in, until a roughly circular pool had been formed about 18 feet across and 5 feet deep. The overflow eventually measured more than 500,000 gallons per 24 hours, which gradually diminished during the following summer, and later became a standing pool. The most remarkable feature was that the water, instead of flowing into the long-existing St. Chad's spring which was only 12 yards away, had forced a fresh outlet at a level about 7 feet higher. In most of the subsequent winters, the new spring started again to flow, the amount of the yield depending on the wetness of the season ..." [ha 042]
SourceThomson, D. Halton (1957) A History of the Portsmouth and Gosport Water Supply Published by the Company 101pp
Area042 - Hampshire Rivers Group
ContributorFrank Law
Reference
Related URL
Geo Reference
Entry Date/Time16/02/2000 12:07:13

 


Warning: Undefined array key "HTTP_REFERER" in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 252

Deprecated: explode(): Passing null to parameter #2 ($string) of type string is deprecated in /home/hydrolog/cbhe.hydrology.org.uk/view.php on line 253

Return to the main page




Forgotten Password