144801951"The floods [of 1960] at Kenton were the worst since 1951... [River Kenn, trib of Exe extuary] "045 - Exe GroupFrank Law
144811249Godstow Priory, above Oxford: "Following a serious flood in the mid 13th century the buildings near the Wolvercote-Wytham road were rebuilt on a slightly different alignment, and fragments of masonry found in the Thames suggest that work continued throughout the 13th century and the earlier 14th" 039 - ThamesFrank Law
144821968Torrington road bridge closed temporarily due to flood damage [R. Torridge]050 - Taw and TorridgeFrank Law
144831855Kelham: "....in 1846 the construction of the Midland Railway necessitated the erection of a bridge to cross the Trent. In 1855 the quaint old timber bridge was destroyed by a great flood.." (engraving of collapsed bridge shown)028 - TrentFrank Law
1448429-09-1960"Local opinion holds that the disastrous floods of September and October dislocated the Devon railway system more severely than any other catastrophe, with the possible exception of the great 1891 blizzard. The first [railway] section breached by floods, on September 29, was the W.R. main line from Newton Abbot to Plymouth at Plympton, where the tracks were to be awash three more times in the ensuing nine days."[Plympton Brook]046 - Dart GroupFrank Law
1448530-09-1960"...by midday the S.R. [rail] bridge over the River Creedy, between Newton St Cyres and Crediton, was under water and soon completely washed away....""....in the afternoon waters spreading across the Exe valley west of Exeter cut the W.R. main line between City Basin Junction and Exminster...diesel locomotives had to be taken out of service because they must not pass through flood water more than four inches deep; steam, therefore, was once again in command of the South Devon main line for a few days..."045 - Exe GroupFrank Law
1448606-10-1960"...October 6 the rains struck again, flooding the S.R. at Copplestone and Yeoford, ..." [R. Yeo trib. of Exe]045 - Exe GroupFrank Law
1448727-10-1960"At Cowley Bridge [rail] Junction, east of Exeter, both lines were impassable from about 1.30 p.m. -- the first flooding of the junction for 36 years -- and by the evening the water had risen two-thirds of the way up the platford at St Davids [station] as Exeter faced its worst flooding for 60 years..." 045 - Exe GroupFrank Law
1448930-11-1888"and [ in the 1900 flood] at the Colyford level crossing the water was 6 inches deep, 4 inches deeper than during the great flood of November 30th, 1888." [Axe] 045 - Exe GroupFrank Law
144901895Wallingford:"The river here again is very much flooded, the river having for several days been within three inches of the top wall of the bridge landing stage....Snow fell here continuously for five hours on Monday morning. "039 - ThamesFrank Law