| 12831 | 1795 | "......several historical documents suggest, that a fourth bridge existed between Court Lodge Farm and Barnjet in Teston Parish. Built around 1760 it is thought this wooden bridge was swept away by flood waters in January 1795. Barming Bridge, again of wooden construction, was also lost during this flood. " [R. Medway] | 040 - Kent Rivers Group | Frank Law |
| 12832 | 1844 | Swineshaw Brook: "In December, 1844, no rain fell, and yet the springs yielded a quantity of water equal to a depth of 1 inch over the whole drainage ground [of 1250 acres to the weir], the mean volume of the stream being the same as in August, 1847, in which month the fall of rain was 3.25 inches. " [R. Tame headwater] | 069 - Mersey and Irwell | Frank Law |
| 12833 | 1847 | Swineshaw Brook: "In December, 1844, no rain fell, and yet the springs yielded a quantity of water equal to a depth of 1 inch over the whole drainage ground [of 1250 acres to the weir], the mean volume of the stream being the same as in August, 1847, in which month the fall of rain was 3.25 inches. " [R. Tame headwater] | 069 - Mersey and Irwell | Frank Law |
| 12834 | 1845 | "In an adjoining valley, down which flows the Swineshaw Brook, similar observations have been made since the end of 1844. This valley lies nearly east and west, and is completely land-locked, turning abruptly to the north through a narrow glen just before it joins the river Tame. The summit of the valley is at Windyate Edge, which is the summit also of two tributaries of the Etherow, the Hollingworth and Arnfield brooks. Rain gauges were placed at the bottom of the Swineshaw valley, near the point at which the volume of the stream was measured, and on Windyate edge near the summit. For some time also a gauge was kept about midway. The brook was measured regularly twice a day......The extent of ground draining to the point at which the volume of the stream is measured is 1250 statute acres....[Monthly table follows for 1845]....Rain for the whole year 59.8 ins., of which there passed down the brook 40.704 [ins.]...." [R. Tame headwater] | 069 - Mersey and Irwell | Frank Law |
| 12835 | 1846 | Swineshaw Brook annual rainfall for 1846 was 42.6 inches [flows tabulated for 9 months]: " This year was considerably below the average fall of rain: nearly one of the driest on record ...." [R. Tame headwater] | 069 - Mersey and Irwell | Frank Law |
| 12836 | 1847 | Swineshaw Brook annual rainfall for 1847 was 49.35 inches [flows totalling 37.1 inches being tabulated for all 12 months]: " The quantity of rainfall which was lost...was about 12 ins.: that being apparently the annual amount required for evaporation, the supply of vegetation, and absorption by the ground, in a year of average rain. The springs in this valley are very copious..." [R. Tame headwater] | 069 - Mersey and Irwell | Frank Law |
| 12837 | 1796 | Aberystwyth: "1796 Bridge Swept away by river swell (Replaced in 1800) " [R. Ystwyth] | 063 - Ystwyth Group | Frank Law |
| 12838 | 1844 | Aberystwyth Chronology:" 1844 Severe drought " | 063 - Ystwyth Group | Frank Law |
| 12839 | 16-10-1886 | Aberystwyth: "1886 October 16thGreat Flood - Trefechan bridge destroyed and North Parade under 6 feet of water. (The present bridge completed two years later.) " | 063 - Ystwyth Group | Frank Law |
| 12840 | 08-12-2000 | Ross-On-Wye: "The two images .....were taken on 8 December 2000 when, following two months of unseasonable heavy rain, the Millpond overflowed flooding much of the town centre. This was the first time that Brookend Street had flooded badly in over 20 years " | 055 - Wye (Herefordshire) | Frank Law |