| 9929 | 1854 | 1854 February Quoting Brunel's Report of 7/2/1853 'Within the last few days, however a large slip has occurred near Dawlish; a piece of cliff, not within the [GWR] Company's boundaries and which had never been touched by the works of the Railway, has given way in consequence of the unusual amount of land water; and a considerable portion of the sand and debris was carried across the line...' | 045 - Exe Group | Frank Law |
| 9930 | 1844 | 1844 November p192 'Floods were a frequent trouble on the Bristol and Exeter [railway line]. The line had hardly been open for six months when the Exe overflowed in November 1844 and submerged nearly two miles of it near Exeter, entirely stopping the traffic for several days and obliging the passengers to travel by road to and from the level crossing at Stoke Canon. After this the line seems to have been raised above flood level ...' | 045 - Exe Group | Frank Law |
| 9931 | 1853 | 1853 winter p193: '... the Exeter and Crediton Branch was much damaged [by floodwater] and the traffic thereon suspended for some time in the winter of 1853.' | 045 - Exe Group | Frank Law |
| 9932 | 1875 | 1875 November/December p193: 'In the flat country between Bridgwater and Taunton and on the Yeovil Branch [GWR] there were frequent floods culminating in November and December 1875, when both the main line and the branch near Durston were under water for nine weeks, without, however, causing an entire stoppage of the traffic'. [R. Tone] | 052 - Somerset Rivers Group | Frank Law |
| 9933 | 1894 | 1894 November p193 Yeovil GWR branch: 'Similar [to November/December 1875], though not such prolonged, flooding occurred at the same place in November 1894.' [R. Tone] | 052 - Somerset Rivers Group | Frank Law |
| 9934 | 1882 | 1882 November/December p193: 'Traffic on the [rail] branch was entirely stopped between Athelney and Langport for a month in Nov.-Dec. 1882, by flood damage.' [R. Parrett] | 045 - Exe Group | Frank Law |
| 9935 | 1876 | 1876/77 winter p344: 'Like its predecessor, the winter of 1876-7 was very wet, causing much trouble by floods, especially [to the railway] between Bridgwater and Taunton...' [R. Tone] | 052 - Somerset Rivers Group | Frank Law |
| 9936 | 1876 | 1876/77 winter p344: '...the winter of 1876-7 was very wet, causing ... several landslips, one of which in the deep Harbury Cutting on the northern main line near Leamington blocked the Up line from December till April ...' | 054 - Severn | Frank Law |
| 9938 | 1852 | 1852 winter p494: '... the opening of the [railway] line south of Evesham had been delayed ... by the extraordinary floods of the 1852 winter, which had caused serious damage to the timber bridge over the Avon at Aldington and large slips at several places, the worst near the Mickleton Tunnel' [Warwickshire Avon] | 054 - Severn | Frank Law |
| 9939 | 1852 | 1852 autumn p649: 'The autumn was the wettest for many years, and the heavy rain did much damage to the new cuttings and embankments. Round Oxford the country was under water for weeks and at Kennington the railway was flooded in November to such an extent that engines could not pass ... it was necessary to draw the trains through the water by means of horses ... The actual time required to pass a train through the water was about 12 minutes.' [R. Thames] | 039 - Thames | Frank Law |